Rehabilitation and upgrade of Three WWTPs in Iasi with the following capacities:
- Targu Frumos Plant: 6,200 m3/d
- Harlau Plant: 4,700 m3/d
- Podu Ioleai Plant: 3,600 m3/d
- Targu Frumos Plant: 6,200 m3/d
- Harlau Plant: 4,700 m3/d
- Podu Ioleai Plant: 3,600 m3/d