The project consists of the Engineering, Procurement and Construction of a new engineered sanitary landfill facility for disposing municipal solid waste, located about 12 Km from the main city of Al Buraimi for a duration of 1 year.
The engineered landfill is designed to receive 125 ton daily of domestic waste and to ccommodate 500,000 m3 of waste.
The engineered landfill is designed to receive 125 ton daily of domestic waste and to ccommodate 500,000 m3 of waste.