Beirut

Client: Council for Development and Reconstruction
Consultant: Dar Al Handasah - Shair & Partners
The works include the upgrading of the intersections at Hayek and Saloumeh Roundabouts through the construction of a permanent cast-in-situ post-tensioned concrete box girder bridge carrying Jisr El-Wati as well as Qalaa eastbound and northbound traffic over the Hayek Roundabout towards Sin El-Fil Boulevard and intersecting the Saloumeh – Dekwane Road. The overall length of the bridge (including embankment and opening) is approximately 560 m, with a 310 m long and 16 deck spans prestressed concrete. The project is executed at road intersections with very heavy traffic.
Description of work:
• Archaeological investigation.
• Construction of post-tensioned concrete box girder bridge, abutments, piers and retaining walls
• Roads, asphalting, concrete barriers, curbing and tiling
• Street lighting, traffic signals
• Road signing and marking, landscaping
• Utilities and utility relocation