The works include the following:
• Traffic diversion on main highways
• Construction of a cast-in-situ double-cell box girder bridge structure with a total length of 195 meters and 800 mm diameter piles
• Construction of new roads including asphalting, street lighting, road signing and marking, water drainage, and landscaping
• Traffic diversion on main highways
• Construction of a cast-in-situ double-cell box girder bridge structure with a total length of 195 meters and 800 mm diameter piles
• Construction of new roads including asphalting, street lighting, road signing and marking, water drainage, and landscaping