The works include but are not limited to:
-Surveying,
-Design,
-Execution and installation including: Mountain cut, Embankment Fill, Structure Fill, Slope Protection,
Marine works include:
- Revetments design & construction and
- Design & construction of Two Breakwaters with geotube to protect the new beach development including Dredging to obtain required sand for Beach Top Layer,
- Design & construction of Marina
- Supply and Installation of Rock for the Construction of Revetment, Groynes Breakwater, Rock Scour Protection System and Design Fabrication Furnishing and
- Installation of Marina.
Project Related Activities:
- Mountain Cut and Blasting,
- Slope Protection,
- Embankment (Earthwork),
- Beach Development,
- Marine Breakwaters,
- 2 Revetments and Marina