Construction of Batinah Expressway Package 5

Batinah - Oman

Client: Ministry of Transport and Communications
Consultant: Botek & Partners Engineering Consultancy LLC
 

This package comprises of 41 km of the Batinah expressway.

The construction works include the following major structures:
- 2 cloverleaf interchanges at Falaj al Qabail & Sohar industrial area (box girder).
- 1 partial cloverleaf interchange at Liwa (box girder).
- 3 wadi bridges: Wadi Al Jizi – Wadi Bani Umer – Wadi Fizh (pre-cast beams)
- 4 underpass bridges: U.P Bridge1 – Gas Line U.P – Sohar U.P – Railway U.P (pre-cast beams)
- 1 flyover bridge (box girder)
- 4 weigh stations
- 2 service areas and 4 rest areas

The project also comprises 130 single and multi-cell reinforced concrete box culverts, median drainage system, dykes and embankment protections.
The total length of the wadi bridges is 1,380 m consisting of pre-cast / post-tensioned concrete girders with pile foundations.

Main Works as considered in the Baseline:
- Clearing & grubbing 4,230,762 m3
- Borrow earth 13,059,801 m3
- Excavation 5,017,929 m3
- Precast beams production 1,528 number
- Concrete 338,232 m3
- Steel 32,500 tons