Al Dhafra Landfill & Al Mafraq Transfer Station

Abu Dhabi - UAE

Client: Tadweer
 

The project consists of the operation and management of Al Dhafra landfill and transfer station for municipal solid waste up to 20,000 tons a day.

Description of Work:
01/ Procurement of mobile equipment,
02/ Daily operation of the landfill of up to 20,000 t/day of Municipal Solid Waste, Mixed Waste, C&D Waste, and Hazardous Waste,
03/ Design and construction of Engineered Hazardous Waste Cells,
04/ Design and construction of a Material Recovery Facility (MRF) at the landfill site,
05/ Operation & maintenance of the Transfer Stations with a capacity of 2,000 t/day of waste,
06/ Operation and maintenance of the MRF with a capacity of 5,000 t/d.