The project consists of the construction of New Bridge and Underpass at Nahil (E20 Road) with associated ramps and Roundabouts
to provide easy accesses to the Palace and Majlis in that particular location.
The works include:
-Construction of one Bridge.
-Construction of one Underpass that involved raising the level of the existing E20 for approx. 800m.
-Construction of one Roundabout on both sides of the Bridge (both sides of E20).
-Construction of two Ramps on both sides of the Bridge (both sides of E20).
-Construction of one Roundabout on both sides of the Underpass (both sides of E20).
-Construction of two Ramps on both sides of the Underpass (both sides of E20).
-Relocation/Protection of existing services.
-Electrical power supply and lighting works.
-Ancillary works required to complete the works.