EPC for Demi Water Production – Damietta 2

Damietta - Egypt

Client: Techint S.P.A.
 

Methanol production -Water Treatment Plant

Capacity:
Ultrafiltered water: 600 m3/h
Demi-water: 2x45 m3/h
Polishing filters: 2x130 m3/h

Process:
- Pre-treatments,
- 2 pass ultrafiltration plant,
- 2 pass 2 steps reverse osmosis plant,
- Degassing tower,
- EDI,
- Cooling tower side stream filters,
- Condensate polishing filters (mixed beds),
- Sludge treatment (lamella clarifier and filter press)

Note: Water produced for the use in a methanol plant