Description of work:
• Scaling rock cut slopes
• Removing loose rocks from the slopes to form a solid rock area
• Cutting back existing unstable rock cut slopes in high areas in order to establish a solid and safe cut surface
• Rehabilitation of the existing asphaltic pavement in order to prevent potential failures
• Repair, reinstatement or replacement of footpaths
• Repair and reinstatement of concrete crash barriers and guard rails
• Upgrading and improvement of the existing stormwater drainage
• Repair and reinstatement of damaged road slopes including the existing protection works
• Repair and reinstatement of pavement and side slopes